Flow Augmentation For Kootenai River White Sturgeon Gets Underway At Libby Dam

Flow augmentation for Kootenai River white sturgeon got underway today, Friday, May 22, at Libby Dam after U.S. Army Corps of Engineers water managers, along with federal, tribal, and state fishery biologists, have determined that water temperatures and flows are sufficient for the operations to begin.

Read the full article…

Become a Member and get unlimited access to all articles.

Register

Already a member? Log in here
© Copyright 1997- 2026 Columbia Basin Bulletin. All rights reserved.