The potential had remained that a Bradwood Landing liquefied natural gas terminal could be constructed at a proposed site 20 miles upriver from Astoria, Ore., but, in contrast, a pipeline to connect it to a transmission system could not legally be built.
Share this: https://columbiabasinbulletin.org/g5c9
