The Federal Energy Regulatory Commission sided with wind generating companies in a Wednesday order giving the Bonneville Power Administration 90 days to correct what the commission called an “unduly discriminatory” policy limiting transmission of wind, thermal and other non-hydro power during high water flows in the Columbia River basin.