The U.S. Army Corps of Engineers, Walla Walla District, reopened navigation locks on the Columbia and Snake rivers on March 29 after an eleven-week outage. This extended outage allowed the district to perform routine maintenance and to replace aged equipment to reduce the risk of asset failure.