Columbia River basin federal, state and tribal salmon managers have asked hydro operators to spill at least 50,000 cubic feet per second of water at Bonneville Dam to pass about 7.5 million tule fall chinook being released March 2 from the Spring Creek hatchery located alongside the Bonneville pool.