CHIEF JOE DAM SPILL DEFLECTORS BEING INSTALLED, TESTED

The long-sought installation, and testing, of “spill deflectors” at the Mid-Columbia River’s Chief Joseph Dam has begun with the ultimate goal of improving water quality downstream for salmon and other aquatic life and increasing power generation flexibility.

Read the full article…

Become a Member and get unlimited access to all articles.

Register

Already a member? Log in here
© Copyright 1997- 2026 Columbia Basin Bulletin. All rights reserved.