With over a week since spilling water at Dworshak Dam to test total dissolved gas degassing equipment at the federal fish hatchery downstream, the U.S. Army Corps of Engineers is scheduling maintenance on a hatchery pipeline and the Bonneville Power Administration is scheduling a transmission test at the dam.