The milestone of placing the second of 10 massive hydroelectric turbines and shafts into its operating position has been accomplished at Grant PUD’s Wanapum Dam.
The milestone of placing the second of 10 massive hydroelectric turbines and shafts into its operating position has been accomplished at Grant PUD’s Wanapum Dam.