A draft of Columbia and Snake river Total Maximum Daily Load, circulated as a preliminary draft by the U.S. Environmental Protection Agency among participants in late September 2002, is still not ready for public review.
A draft of Columbia and Snake river Total Maximum Daily Load, circulated as a preliminary draft by the U.S. Environmental Protection Agency among participants in late September 2002, is still not ready for public review.